Guidelines on Subcontracting
Contract Conclusion with Partner Companies Selection / Operation of Partner Companies Operating Internal Review Committee for Subcontracting Transactions Issuance and Retention of Documents
-
The purpose of this guideline is to establish reasonable and transparent transactional practices by providing contents that should be mutually complied by both Hyundai Rotem (hereinafter referred to as the “Company” or “A”) and the other party to the transaction (hereinafter referred to as “Supplier” or ”B”
-
2.1 Matters Related to Contract Conclusion Process2.2 Compliance Details for Contract Conclusion2.3 Prohibited Activities When Concluding a Contract
-
3.1 CBS (Cost Breakdown Structure)It refers to the group code system for cost, which is the standard for budgeting railway vehicles.3.2 Request for Company Selection (SR: Sourcing Request)It refers to the act of requesting purchasing team to select a company based on the specification information (prepared by design team) with enough details to select a company.
-
4.1 Partner Company Selection MethodIn order to be a partnering company, a Supplier has to be registered to the VAATZ system. After the registration, the basic transaction contract will be executed. Then, Hyundai Rotem will conduct a preliminary consultation to decide purchase method of the major parts to ensure transparency and fair trade.※ VAATZ (Value Advanced Automotive Trade Zone): The new company registration system will be applied only to Mass Production projects. If the purchase method is changed, the change can be specified in an approval request or report. Each product or item will go through one of the following three Supplier Selection Methods to start the transaction with Hyundai Rotem.4.1.1 Competitive BiddingA RFQ will be sent out to at least two companies whose manufacturing capability is certified by Hyundai Rotem through site inspection and document review. The lowest bidder to the RFQ will be selected.※ RFQ: Request For Quotation※ Applying Competitive Bidding: Competitive Bidding can be applied when a product or item is well standardized in terms of quality and performance. It would be applied to the most instances, except for Strategic Purchase and/or Bidding with Multiple Criteria Consideration.4.1.2 Bidding with Multiple Criteria ConsiderationHyundai Rotem will hold a meeting with potential bidders to explain requirements and specifications. After receiving quotations and proposals from the bidders, Evaluating Committee will decide a Supplier based on its price, quality, delivery schedule, technology, development ability, cost reduction, management ability and etc.※ Applying Bidding with Multiple Criteria Consideration: Parts that are directly related to the performance of end-product, and of which quality varies greatly depending on the manufacturer’s design and development abilities4.1.3 Strategic PurchaseWhen Competitive Bidding or Bidding with Multiple Criteria Considerationis inapplicable for a product or item, a specialized company can be selected through a method other than competitive bidding or Bidding with Multiple Criteria Consideration.※ Applying Strategic Purchase1) When the product is designated by the customer or government agency2) When the product or item is monopolized by a single company.3) When the product has a specialized function, or a company, who has previous business experience with Hyundai Rotem, has a JIG or die (mold).4) Due to the infrequent development, low product prices or small order quantity, Competitive Bidding or Bidding with Multiple Criteria Consideration would harm the Supplier’s business operation.5) When Hyundai Rotem has a long-term supply contract with the Supplier for specific reasons, such as localization of the product and etc.6) When it is necessary per other procurement policies.4.2 Contract Selection Process4.2.1 Establishing Pre-Purchase StrategyIn order to ensure transparent and fair purchasing, Pre-Purchase Strategy for cost reduction and company selection shall be prepared and approved by executive management.[Applicable Items: Major long-lead parts/materials or Part/materials that require pre-purchase strategy, etc.]4.2.2 CBS (Cost Group System) RegistrationThe Technical Sales Team leader will prepare and register contents of CBS, including target product price, and send it to Design and Procurement Team.4.2.3 Supplier Selection Stage(SR: Sourcing Request)The Design Team leader may attach design requirements and specifications, drawings and other data to the CBS code, received from the Technical Sales (marketing/PM) Team, and send it to the Procurement Team. Leader of Design Team can also recommend a qualified Supplier.4.2.4 Assigning Applicable ItemsThe person in charge of the Procurement Team selects his or her item according to the job assignment, or relevant part leader may assign items to them.4.2.5 Establishing Pre-Purchase PlanExcept for advanced strategic purchase items, when target budget is finalized, a pre-purchase plan, such as Competitive Bidding, Bidding with Multiple Criteria Consideration and Strategic Purchase, shall be established and approved,
During the individual purchases, if pre-purchase plan cannot be complied due to specification changes or otherwise inevitable changes, purchase for the item should be processed after consulting with or report to relevant superiors.4.3 SRM (Supplier Relationship Management)4.3.1 Hyundai Rotem Integrated Purchasing System [e-POPS] is operated to share information and to cooperate with trading companies.※ e-POPS (Powerful & Open Procurement System) :srm.rotem.co.kr4.3.2 In order to support information sharing and cooperation with trading companies, Hyundai Rotem can hold a meeting with partnering companies.4.3.3 A company that wants to contract with Hyundai Rotem can use a new supplier guidance system and a new registration system in e-POPS.4.4 Operating Small Business Support OrganizationHyundai Rotem may operate a designated organization to support small businesses for quality, technology development, funding, education, and training. -
5.1 Compliance Details Regarding Conclusion of a Contract5.1.1 Providing Contract Document in Advance① In principle, “A” and “B” should conclude the contract before any work is performed under the contract. At the latest, the contract must be properly executed before any work is performed for delivery of the product/item.② When a Supplier has frequent transactions, the basic contract can be concluded first, and Purchase Orders (including electronic Purchase Order) for individual items can be considered as a contract.③ The contract with Supplier shall include contract amount, payment method, contract price adjustment for law material cost variation and procedures for contract price adjustment. The contract must incorporatethe ENFORCEMENT DECREE OF THE FAIR TRANSACTIONS IN SUBCONTRACTING ACT.④ In the event that the change in contract quantity is clearly anticipated due to minor and frequent additional work, an adjustment agreement must be executed immediately upon completion of the delivery.⑤ If additional requests are made within a significantly shorter period than the normal permitted period, the major terms and conditions must be agreed in advance in writing.5.1.2 Determination of Unit Price by Reasonable Calculation Method① To determine the Unit Price, contract quantity, specification, delivery date, payment method, product quality, material price, labor cost, market trend and etc. will be considered, and then proper overhead cost and profit will be added through reasonable calculation method. The calculated unit price will be agreed between both parties.
However, in the case of total price bidding, the bidding price (or additional VE price) shall be the unit price.② Unless otherwise agreed, the unit price of ① shall include all costs such as packing costs, freight, unloading costs, insurance premiums to the point of delivery designated by ‘A’.③ If there is a sudden change in the pripce or the rate of the item, which is included in the price set forth in paragraph 1, during the term of the contract, or if any of the following conditions arise for the remaining contract quantity after 60 or more days have passed after the contract execution, either party can request for an adjustment of the contract amount. “A” shall initiate the settlement discussion within 10 days from the date of the request and “B” shall adjust the contract amount by mutual agreement within 30 days. However, if both parties acknowledges that it is difficult to implement the contract without adjusting the contract amount (i.e., sudden rise of the raw material price), the contract amount may be adjusted within 60 days from the contract execution date (or the adjustment date if the contract amount is adjusted after the contract conclusion).ⓐ Changes in raw material prices: if the price of raw materials in the current market fluctuates by more than 5% from the base raw material priceⓑ If price adjustment is required due to design changes or suggestions for improvement④ “A” or” B” shall request for adjustment to the Subcontract Dispute Mediation Council if any of the following applies.ⓐ No agreement is made within 10 days after the request for adjustment by “A”ⓑ If no adjustment occurred within 30 days from the date of adjustment requestⓒ “A” or “B” has expressed intention to discontinue negotiationsⓓ If the difference between the proposed adjust amount by “A” and “B” was greater than double.ⓔ When delay of the agreement would damage “A” or “B” significantly, i.e. its operation becomes difficult.⑤ If the unit price determination is delayed due to special reasons, the temporary unit price will be agreed and applied. In this case, the difference between the temporary unit price and the final unit price shall be adjusted retroactively when the unit price is finalized.⑥ “A” should periodically examine the standardized rate in the calculation of the cost to propose suitable rate for the actual circumstances. However, considering the labor cost of the same industry, Hyundai Rotem sets the rate according to the characteristics of the company such as working conditions, supplier size and technology level and etc.5.1.3 Delivery Date and Delivery① Delivery date means the date on which ‘B’ shall deliver ordered item to the place designated by ‘A’, according to the individual contract.
This shall be determined according to the agreement between ‘A’ and ‘B’ for each individual contract.② If the delivery date, agreed at the time of contract conclusion, is changed subsequently, the change must be clearly specified. If the delivery date is shorter than usual, (in the case of emergency order and etc.) it shall be mutually agreed.③ If “A” unreasonably delays or rejects to accept the delivered products, without any fault on “B”, “A” shall compensate any damages suffered by “B” due to such delay or rejection.5.1.4 Objective Inspection Standard① For the inspection of the delivered products, “A” and “B” shall agree and establish an objective, fair and appropriate inspection standards and methods.② Upon the delivery, “A” shall immediately issue a receipt even if the delivered product is not yet inspected. The inspection shall be promptly conducted in accordance with the prescribed standard and procedures.③ Unless there is a justifiable reason, ‘A’ shall notify the results of the inspection within 10 days from the date of delivery by the supplier.④ Before or during the inspection period, “A” shall manage the delivered products with care of a good manager before or during the inspection period.5.1.5 Payment① If a supplier is consigned to manufacture or perform otherwise, it shall be paid on the payment due date, as early as possible, within 60 days from the date that product is delivered (the date of take-over for construction and tax invoice date (at least once a month), as agreed by the parties, for the transaction with frequent delivery).② In the case a supplier is consigned to manufacture or perform otherwise, Hyundai Rotem shall pay the Supplier within 15 days of the date it received completion payment from client for manufacture, repair, construction or serviceor on the payment due date (if payment due date is earlier than 15 days).③ If milestone payments are received upon progress of manufacture, repair, construction or service, Hyundai Rotem shall pay the Supplier within 15 days or on the payment due date (if payment due date is earlier than 15 days) for the according to the portion of the work performed by the Supplier.④ Payment to the Supplier shall have greater cash ratio than Hyundai Rotem received from the client in relation to the consigned work such as manufacture of the product.⑤ If the client pays Hyundai Rotem with promissory note, Hyundai Rotem may pay the Supplier with promissory note. However, Hyundai Rotem’s promissory note shall have earlier expiration date than client’s promissory note.⑥ If the Supplier is paid in promissory note, the note must be discountable at the financial institution established under the law. The discount amount for the period from the date of issuance of the note to the maturity date of the note (at the discount rate declared by the Fair Trade Commission) shall be paid on the day of issuing the check.⑦ In the case of issuing a note within 60 days from the receipt of delivery, the discounted amount shall be paid within 60 days from the receipt of delivery for the period from the day exceeding 60 days to the maturity date.⑧ If the payment is made by alternative payment means, commission fee (including interest on loans) for the period between the subcontract payment due date and payment date (credit approval date for corporate credit cards, credit transfer date for foreign currency receivables, purchase date for purchasing credits) shall be paid.⑨ If the payment is made by alternative payment means within 60 days from the receipt of delivery materials, the commission fee for the period between the receipt date and subcontract payment due date shall be paid to the subcontractor within 60 days of the delivery date.⑩ If the payment is made after 60 days from the delivery receipt date, the interest shall be paid at the interest rate determined and notified by the Fair Trade Commission for the excess period.5.1.6 Reasonable Return Procedure for Defect Found After the Delivery.① Defective goods shall be returned according to the procedures to decide the cause of the defects, types of causes, proportion of liability and, etc. as agreed between the parties. Handling shortages, rejects and overdue items.5.1.7 Termination of Contract① The reason for termination of the contract shall be determined by agreement between the parties, and shall be distinguished between where the final notice is not necessary and where final notice is required. However, If there is any reason for termination, it shall be notified in writing, without delay.② The contract can be terminated without a final notice in the following casesⓐ When a financial institution suspended Supplier’s transaction, or government authority revoked its business license or suspended the operation.ⓑ When the other party is deemed unable to fulfill the contract due to serious business reasons such as bankruptcy, compulsory execution by third party, insolvency, commencement of composition, request for company reorganization and etc.ⓒ When both parties acknowledge that it is difficult for a party to fulfill the basic or individual contract due to dissolution, transfer of business, or merge another company and etc.③ A final notice is required to terminate the contract in the following cases. However, the other party must be given one month to comply with the final notice. If the other party failed to comply, the contract can be terminated.ⓐ When the other party commits material breach of the contract when Hyundai Rotem delayed its duty under the contract without justifiable reason, and thus caused supplier’s work to be interruptedⓑ When the supplier, without justifiable reason, rejects the production of ordered parts or delays to initiate the production, and thus makes it difficult to comply with delivery schedule.ⓒ If there is a reasonable cause to believe that the supplier’s technology, production and quality control capabilities are not sufficient to fulfill the contract5.2 Prohibited Activities at Conclusion of a Contract5.2.1 Not providing Contract Document① Issuing a written document that does not contain matters that are difficult to confirm at the time of commission without justifiable reason② Refusing to amend the previous document that did not contain certain matters, when the parties later agreed and confirmed.③ Not confirming or denying in writing within 15 days of request for confirmation from the other party regarding orally consigned contents such as work contents entrusted by supplier, subcontract payment, consigned date and etc.④ Not signing on a written consent or denial when replying for orally consigned contents⑤ Not retaining relevant document for three years of retention period as required by the statutes and Hyundai Rotem’s internal policies.⑥ Retaining documents that was falsified or contains incorrect information for three years.⑦ Not retaining records related to deciding subcontract payment such as bidding statement, bidding award reporta, quotation and etc.⑧ Not issuing additional contracts or work instructions, even though the scope of additional work is distinguishable and the amount is significant.5.2.2 Unjustly Determining Subcontract Payment① Unilaterally decreasing subcontract payment at a fixed rate without justifiable cause② Making unilateral deduction from the subcontract payment whether it was cooperation request or not.③ Determining the price in unlawful discrimination against a particular supplier or determining the price by unilaterally lowering the unit price without consent from the other party④ Determining payment by inducing supplier’s mistake, or deceiving the supplier by presenting another supplier’s⑤ For Competitive Bidding process, contract amount shall not be lower than the lowest bid without justifiable cause.⑥ Unilaterally decreasing unit price without justifiable cause, such as decreased low material price and etc.⑦ Determining lower price for a specific supplier than other suppliers in unlawful discrimination, when there is no difference in payment terms, transaction quantity, or difficulty of operation, etc.⑧ Applying unit price for large order quantity, when the actual order quantity is small.⑨ When the work was consigned without fixed contract amount, determining price, which is lower than typical price, without supplier’s consent.⑩ Decreasing contract amount by showing another supplier’s quote, which was prepared based on the Supplier’s relevant technical information that was provided per Hyundai Rotem’s request.5.2.3 Oral Request for Proposal or Request for DevelopmentRequesting to decrease orally agreed unit price or cancelling development after production equipment or other production preparation was completed.5.2.4 Unjustifiable Interference in Management① Interfering with Supplier’s HR related matter, including forcing the Supplier to hire someone against Supplier’s will or having the Supplier to obtain approval from person in charge of procurement for hiring and firing its employees.② Restricting the transaction between the Supplier and its suppliers by imposing contract conditions that is irrelevant to the purpose of the contract, including quality control and satisfying delivery schedule and etc., between the Supplier and Hyundai Rotem.③ Limiting the manufacturing capacity or product list, or prohibiting the Supplier from trading with the competitor of Hyundai Rotem or its affiliates④ Requiring the Supplier to provide technical data for the product without justifiable reason5.2.5 Not Adjusting Subcontrac Payment due for Design Change and etc.① Not paying or paying less than the percentage or content that Hyundai Rotem received from its customer for design change or changes in economic circumstances② In case Hyundai Rotem’s customer adjusted contract amount for design change or changes in economic circumstances, not increasing or decreasing the Supplier contract amount within 30 days or adjusting the contract amount after 30 days③ Not paying delay charge, check discount, commission fee regarding the exceeding period when payment in cash or check or other supplementary payment method is not paid within 15 days from receiving additional amount due to change in design or economic conditions and etc.④ Not notifying the supplier of the cause and contents of increase or decrease in amount within 15 days from the date such increase or decrease in contract amount is received, due to change in design or economic conditions and etc.
(Except when partyHyundai Rotem’s customer notified the Supplier directly)5.2.6 Not Adjusting Subcontract Payment for Changes in Raw Material Prices① Not proceeding with actual consultation procedures such as holding a meeting, exchanging opinions, or suggesting a unit price adjustment after notifying to commence negotiations or not responding to consultation request② The person in charge of adjusting the unit price does not engage to the consultation even though 30 days have elapsed after the consultation request③ Repeatedly offering prices that the other party cannot accept, without objective grounds such as market research to adjust unit price, calculation of cost and etc.5.2.7 Unfair Refusal to Accept① Refusing to accept the delivered products, when it is difficult to determine whether it conforms to the consigned work or not, due to unclear consignment deion.② Refusing to accept items that are already consigned to the Supplier for reasons such as claims from customer, ordering party or foreign importer, poor sales and etc.③ Refusing to accept late delivery, even though it was impossible to deliver within due date, because of late supply of raw materials that was supposed to be provided by Hyundai Rotem④ Applying an inspection standard higher than usual, when the inspection standards were not established.⑤ Even if the standards are estalished, refusing to accept because the standard is unclear or by applying higher standard than the established one.⑥ Even though there was a request for acceptance from the Supplier, refusing to accept goods without justifiable reasons, such as shortage of storage space⑦ Refusing to accept the already ordered without groundsgoods, because the bankruptcy of the Supplier or other reason makes the stable supply improbable.⑧ Refusing to accept other works, when a supplier was consigned for many works and only one of them was defective, or when Hyundai Rotem’s customer cancels or stops the order.5.2.8 Unjust Return① Returning delivered goods due to cancellation of order from customer or change of economic situation② Returning delivered goods for unfair inspection result based on unclear standard and method③ Returning the defective product when the defects resulted from defective raw material provided by Hyundai Rotem.④ Returning for late delivery when Hyundai Rotem’s supply of raw material was late.⑤ Returning already accepted items because of claims from, client, customer or foreign importers, or because of weak sales and etc.⑥ Returning the items that passed a third party inspection, when the third party was contracted for the inspection.⑦ Returning late delivery when the delay was previously waived.5.2.9 Unfair Decrease in Payment① Decreasing payment for cancelled order by customer or changes in economic circumstances, or through request for cooperation, when a condition to decrease payment was not specified at the time of the consignment.② Retroactively applying re-negotiated price to the work performed prior to the agreement.③ Reducing payment excessively for paying in cash or prior to the payment due date.④ Unilaterally reducing payment for a immaterial mistake the of supplier, which does not have actual impact on the contract.⑤ Having supplier to buy or use Hyundai Rotem’s material or equipment that are necessary for manufacturing, repairing or constructing, and making excessive deduction than usual price or charge.⑥ Reducing price due to the fact that the price index or raw material price at the time of payment is lower than the time of delivery and etc.⑦ Reduction of payment due to unreasonable reasons such as operational deficit or reduced product price⑧ Reducing indirect labor costs, general administrative expenses, profits, and value added tax, in deviation from the original contract⑨ Making bethe supplier responsible for workers’ compensation, unemployment compensations and other expenses that Hyundai Rotem is responsible under the relevant laws and regualtions.⑩ Reducing payment due to failure to keep the delivery schedule, when Hyundai Rotem delayed in providing necessary materials or equipment to the supplier or requiring to meet unrealistic delivery schedule.⑪ Reduction of already determined subcontracting amount due to continuous ordering, or contracting with the total amount and then reducing the payment for details of manufacturing or construction performance.⑫ Reducing the payment of the contract because Hyundai Rotem contracted with customer at low-price.⑬ Reducing the payment through contract amendment, when there was no actual changes in the consigned work or other conditions.⑭ RReducing the payment by transferring the foreign exchange loss to the supplier, in deviation from the original contract conditions5.2.10 Requesting Exclusive TransactionMandating the supplier to trade exclusively with Hyundai Rotem or companies designated by Hyundai Rotem.5.2.11 Unreasonable Demand for Economic Benefits① Requiring economic benefits such as subsidies, incentives, and grants on for starting business with the supplier or making large orders② Requiring economic benefits such as donations, incentives, and grants for unreasonable reasons, such as deteriorating profit or operational conditions③ Requiring economic benefits such as donations, incentives, and grants when there is no obligation for the supplier to be responsible5.2.12 Transferring Cost Caused by Hyundai RotemTransferring costs, that is incurred because of Hyundai Rotem’s wage increase or delays in internal approval process to the supplier.5.2.13 Unfair Payment in KindMaking payment-in-kind to the supplier against its will, in deviation from the original contract.5.2.14 RetaliationRestricting the supplier from participating to the bids, suspending transactions or otherwise penalizing the supplier because the supplier filed complaint to the Fair Trade Commission as a violation of the Subcontract Act.5.2.15 Evasion① Trying to circumvent the application of subcontracting law② When the Fair Trade Commission ordered corrective measures and payment to the supplier, recouping such payment or deducting it from contract payment.③ Paying the trading company bill discount charge, delayed interest and etc., then unilaterally decreasing the unit price by the corresponding amount.5.2.16 Forced Purchase of Items① Forcibly selling or making the supplier to use products or services of Hyundai Rotem, its affiliates or a company designated by Hyundai Rotem without justifiable reason.② Repeatedly requesting to purchase when the supplier stated or is evident that it has no intention to buy.5.2.17 Unfair Payment Claim① Having the supplier to purchase or use product or services of Hyundai Rotem, its affiliates or a company designated by it, then requesting for advanced payment for the entire contract amount or in part.② Having the supplier to purchase or use product or services of Hyundai Rotem, its affiliates or a company designated by it, then asking for higher price then it purchased from others or forcing unfavorable contract conditions than to others.5.2.18 Prohibition of forcibly requesting technical data① Forcing the supplier to provide technical data to Hyundai Rotem or any third party designated by it without justifiable reason.ⓐ Data on production, repair, construction or service knowhow, that is confidential and/or proprietary.ⓑ Information related to intellectual property rights such as patents, utility model rights, design rights, copy rights and etc.ⓒ Other technical or managerial information that is useful for business activities and has an independent economic value.② Use of technical data obtained from a the supplier for its own use or for a third party5.2.19 Using Unfair Special Terms and Conditions① Mandating contract conditions that unreasonably infringe or restrict the interests of suppliers② Mandating contract conditions that make suppliers responsible for the costs incurred by the supplier to perform Hyundai Rotem’s request other than specified in the contract.③ Mandating contract conditions that make suppliers to pay expenses related to responding to civil complaints and industrial accidents that should have been born by Hyundai Rotem④ Mandating contract conditions that make suppliers responsible for the costs incurred by the supplier to perform Hyundai Rotem’s request other than specified in the RFQ. -
1. This procedure is effective from June 1, 2011.2. This procedure is effective from July 9, 2014.3. This procedure is effective from August 17, 2017.
-
This guideline applies to the registration, changes and cancellation of suppliers, from which Hyundai Rotem Company (the “Company”) purchases production materials, R&D materials, CS materials, jigs and fixtures and molds (the “Production Materials”), materials for pilot production, equipment related goods and materials (including construction), repair materials, equipment (collectively, “General Materials”).
-
The purpose of this guideline is to establish fair subcontracting culture by ensuring transparency and fairness in registering and dealing with suppliers.
-
3.1 Registration of New Supplier3.2 Modification of the Registered Supplier3.3 Suspending Transactions with a supplier
-
4.1 Scope of ‘purchase’ in the guidelines4.1.1 Purchase of outsourced productsPurchasing products from a supplier, who manufactured the products according to the Company’s specifications (Product Spec., PTS, drawing, manufacturing procedures and etc.) This includes when the Company approves the drawing or manufacturing procedures proposed by a supplier.
※ PTS(Procurement Technical Specification)4.1.2 Purchase of Products in the marketPurchasing products that are not manufactured according to the Company’s specification, but generally available in the market either directly from the manufacturer, wholesaler or retailer.4.1.3 Purchase of Facility ProductsThis refers to the purchase of facilities materials, repair materials and consumables, and materials for its installation.4.1.4 Installation/ConstructionThis refers to the installation by subcontractor’s labor and equipment according to the Company’s specification and procedures.4.2 Scope of 'partner' in the guidelineThe partner is a supplier, who manufactures products according to the PTS of the Company. The supplier will be closely monitored by the Company for its technologies, management and product quality.4.2.1 SubcontractorIt is a supplier of the outsourced product manufactured by the purchase specification of the company, and it is subjected under the outsourcing guidance and priority management of technology, management and quality.4.2.2 Market Product suppliersA supplier who supplies items in the above 3.1.24.2.3 Facility product Product SupplierA subcontractor who supplies items in the above 3.1.3, who can have temporary or continuing cooperative relationship.4.2.4 Service Provider In-house process partner companyA company that is contracted to provide services to perform at the Company’s facility using the Company’s equipment for a certain period of time.4.2.5. Installation SubcontractorA company who design, manufacture and install the equipment and conducts trial run as contracted by the Company.4.3 'Partner pool' means a group of partners who are registered and managed by the Company in accordance with certain standards.4.4 e-POPS (Powerful & Open Procurement System) is an integrated procurement system that computerized a comprehensive procurement business such as acceptance of PR, bid, company selection, product, contract, etc.4.5 VAATZ (Value Advanced Automotive Trade Zone) is an independent purchasing specialized market place, uniformly used by Hyundai Motor Group. It is an online system that makes all processes of purchasing, from issuing purchasing order to warehousing of the delivered products.4.6 'Partner registration’ means registering a subcontract/supplier to the VAATZ SYSTEM. -
5.1 The evaluation standards and procedures for supplier registration shall be posted to the integrated procurement system [e-POPS] at all times.5.2 If the evaluation standards is revised, it shall be posted to e-POPS system within 7 days of the revision.5.3 If the registration of a supplier is approved, it shall be notified within 15 days of the approval. If a supplier’s registration is rejected, it shall be notified to the supplier with reason of the rejection, and the supplier will be given at least 15 days of period to submit an appeal.5.4 A supplier may apply for the registration at any time, and the Company will operate a compu.5.5 Without justifiable grounds, the evaluation standards and procedure shall not be applied in discriminating way.
-
6.1 New registration(1) When the Company needs to procure from new supplier (strategic purchase, for example), it should be registered without provisional registration.
※ Provisional registration shall be made when requesting quotation from the partner company at the time of bidding.(2) A new supplier has to be qualified for the below requirements, procurement team may conduct a site inspection with other relevant teams. When registering a supplier with “B” classification, it must be reported to the Chief of Procurement Team first. If a supplier is not qualified, it shall be reported to the Chief of Procurement Team before approve the registration. [However, Market Product/ consumables(gloves/welding rod/others)/distributors/raw materials/foreign companies are excluded]-. New Registration StandardClassification More than 1 hundred million More than 1 billion Notes Credit Rating More than Level “B” More than Level “B” Excluding Monopoly/Market Product/Consumables/Distributors/Foreign Items(Vendors) Liquidity Ratio/Debt Ratio Interest Compensation Ratio Not Applied - Liquidity Ratio: 100%
- Debt Ratio: 300% or less
- Interest Compensation Ratio: 1.0 or higher(3) The new registration of a supplier should be done in company registration menu of VAATZ, with the related documents (Table 2) such as status table of suppliers (Form 2), and the registration should be completed through the approval of the team leader. (However, new registration of a foreign company should be completed by filling out registration request form and submitting it to the financial team.)(4) For companies registered as a partner, there should be no restriction or discrimination on bidding opportunities for posting transactions without justifiable reason." -
(1) When there is a reason for change such as company type, name, representative, registration number, etc., the purchasing team shall attach the related documents in accordance with Table 1(attached data by category) without any delay and change it through team leader’s approval after registering the changes in the VAATZ business registration menu.(2) If the registered company changes in 4M (worker, equipment, material, work method) due to bankruptcy, disposal, merger, etc., or change into another company, the purchasing team confirms to the finance department and if there is a concern about loss of receivables, it should be notified to related departments after receiving related documents from the supplier, such as confirmation letter related to notarized transfer of transaction, etc.(Table 1) Attached Data by Category (Registration Form by Company)
Classification Attached Data Notes New Production Material Company
(Outsourcing product company)Small Company ①,②,③,④ ,⑤,⑦,⑧,⑨,⑩ Large Company ①,②,③,④,⑤,⑦,⑩ General Material Supplier
(facility, equipment, market products)Market Product Company ①,②,③,④,⑤ Change Company Type Individual ⇔ Corporate ①,②,③,④,⑤,⑥,⑨,⑩ • Transaction Transfers, Confirmation of Acceptance
- If receivable loss is expected, it should be submitted with notarization
• Company type change (Corporate→Corporate) is applied when changing the corporate registration number
• If a company is changed to new company, it should be attached as credit report.Corporate ⇔ Individual ①,②,③,④,⑤,⑥ Corporate ⇔ Corporate ①,③,④,⑤,⑥,⑨,⑩ Representative Corporate ①,②,③,④,⑤ Individual ①,②,③,④,⑤ Company Name ①,②,③,④,⑤ Business Registration Number ①,②,③,④,⑤ Address, Telephone Number Change Notification and Letter ■ Attachment :① Material Transaction Basic Contract 1 (Separate copy distributed) ② Partner Company Status Table 1 ③ Copy of Business Registration Certificate 1 ④ Agreement for Payment of Delivery
- Copy of Bank Account Book for Payment
- Copy of Business Registration Certificate
- Confirmation of Bank Contract1 (Submit to finance department) ⑤ Corporate(Individual) Seal Certificate 1 ⑥ Transaction Transfer/Confirmation of Acceptance
- Include Proof of Corporation(Individual) Seal: For bonds, debt, transfer, receive1 ⑦ Certificate of Financial Statement(For 2 years) 1 ⑧ Factory Registration Certificate (Rental Lease Agreement)
- Scaffolding License(For Installing Company Only)1 ⑨ Copy of Corporate Registration(Excluding Personal Companies) 1 ⑩ Credit Report 1 -
8.1 The cause for termination shall be agreed between the parties. However, the causes which do not require final notice and the causes that do not require final notice shall be distinguished. The notice will be given promptly when there is cause for termination.8.2 The case where the final notice is not required.(1) When the supplier’s transaction is suspended by financial authority, or when its operation is suspended or cancelled by government authority(2) If the party is deemed unable to fulfill the contract, due to serious business reasons such as bankruptcy, forced execution by a third party, insolvency, application of company reorganization procedure, etc.(3) If the party acknowledges that it is difficult fulfill the basic or separate contract due to dissolution, transfer of business or merger to another company, etc.8.3 The case where the final notice is required is as follows, and in this case, the contract may be terminated at the time when the other party has set a period of more than one month to perform the contract and the party does not fulfill(1) If the party breaches any material content of this contract or separate contract, If the company, who are supposed to provide necessary materials to the party, delayed the fulfillment of matters necessary for the production of ordered parts without justifiable reasons and caused the supplier’s work to be interrupted(2) If the supplier rejects production of ordered parts without proper reasons or is deemed difficult to deliver within due date for delivery because of delayed start(3) If there is a significant reason to believe that the contract cannot be implemented in a satisfactory manner due to lack of technology, production and quality control capability of the supplier8.4 In the case of cancellation of the registration of a partner, it shall be notified in writing (including emails) and the relevant business operator shall be able to raise objection within 15 days from the date of notification. If registration is cancelled due to reasons attributable to the Company, it should be re-registered immediately.
-
If an employee of the Company does not comply with the guidelines intentionally or in gross negligence, the person shall be reprimanded accordingly.
-
(1) Form 1. Material Transaction Basic Contract(2) Form 2. Supplier Status Table(3) Form 3. Agreement for Payment of Delivery(4) Form 4. Transaction Transfer Confirmation Letter(5) Form 5. New Company Selection and Registration Management Process
-
1. This guideline is effective from June 1, 2011.2. This guideline is effective from July 9, 2014.3. This guideline is effective from August 17, 2017.
-
This guideline defines a set of procedures for the operation of internal review committee to consider the fairness and legality of subcontract transactions between the Company and its partners and its purpose is to contribute to the establishment of fair subcontracting order and to prevent violation of subcontract act in advance.
-
2.1 Matters concerning the composition of internal review committee2.2 Matters on agenda of internal review committee2.3 Matters concerning the operation of internal review committee
-
3.1 The internal review committee is composed of chairperson, assistant administrator, and review committee members.3.2 If professional items are included in the review agenda, such as technology and quality, etc., related team leader (or the responsible person) can be included as review committee member.3.3 Among the members of internal review committee, purchasing manager and procurement planning team shall be the chairperson and assistant administrator of the internal review committee, respectively.
-
The review agenda of the internal review committee shall be determined as follows.4.1 Parts for Rail Business, Defense Business and Plant Business4.2 companyRegistering a new supplier – review on appropriateness of registration standard and procedures4.3 Cancelling transaction with partner company – review on appropriateness of cancellation standards and procedures4.4 Re-Consideration where a company that has been rejected or cancelled by the supplier complains about the decision4.5 Price Determination (Adjustment)4.5.1 Target and scope of reviewThe Committee shall review the transactions that amounts to 2% of the total subcontract amounts for the previous business year (when the total subcontract amount is less than 1 trillion Korean Won), or 1% of the total subcontract amounts for the previous business year(when the total subcontract amount is more than 1 trillion Korean Won).
(Same standard as Fair Trade Commission)4.5.2 Criteria for review- Compliance with the company registration/cancellation/change procedure (RMS-B204)- Compliance with business selection and bidding procedures (RMS-B207)→ Pricing (Compliance with competition/review bidding procedures)4.6 Employee sanctions for violation of related laws such as subcontract law4.7 Subcontracting matters deemed to require review by other internal review committee -
5.1 The internal review committee shall convene regular meetings once a month in accordance with the initiative of the review committee member (it is possible to adjust the date if necessary), and may convene at any time upon the initiative of the chairperson when necessary.5.2 The assistant administrator is responsible for Organizing and proceeding of the internal review committee meeting.5.3 The assistant administrator shall notify each review committee member of the date and place of the meeting at least 7 days before the meeting.5.4 The assistant administrator shall prepare the meeting after comprehensive review of the agenda.5.5 Conducting Internal Review Committee Meeting- The members of the committee shall consider whether the proposal is appropriate or not.- The decisions of the internal review committee shall be decided by the unanimous vote.- If any objection arises during review, re-consideration shall be carried out after supplementing related data.- If it is not possible to come into agreement even after re-reviewing, it shall be decided by the chairman.5.6 The assistant administrator shall summarize the results of review and notify the review committee members after reporting internally.5.7 For matters passed or rejected, each committee member shall take necessary actions for the related department.
-
The documents related to the results and taken measures of internal review committee should be kept for at least 3 years from the end of review date.
-
The purpose of this guideline is to establish a fair subcontracting order by presenting contents that should be mutually complied in the contract between the Company(hereinafter referred to as “A”) and a supplier initiating the transaction(hereinafter referred to as “B”).
-
2.1 Issuing Written Documents during Subcontracting Process2.2 Retention of the Issued Documents Issued2.3 Promoting the Practice of Issuance and Retention of Written Documents
-
3.1 RQMIS (Rotem Quality Management Information System) : This refers to our integrated computer system for quality information.3.2 Decided Subcontracting Payment (Article 114 of FTC Regulations)This refers to deciding the contract amount to be received after ‘B’ manufactures, repairs, constructs, or performs services to ‘A’ and delivers or provided to ‘A’ when it was consigned.
-
4.1 'A' shall issue written documents to the following seven items that are generated during the conclusion and implementation of the subcontract. The documents to be issued are shown in Table 1 below.
Serial Number Written Documents for those Subjected for Issuance Note 1 Basic Contract (Including additional/modified contract) Article 3 of Subcontracting Act 2 Written Confirmation of Subcontract (Attachment 1, 2) Article 3 (6) of Subcontracting Act 3 Written Reduction (Attachment 3) Article 11 of Subcontracting Act 4 Request for Technical Data (Attachment 4) Article 12 (3) of Subcontracting Act 5 Receipt Certificate for Subject Items, etc. Article 8 of Subcontracting Act 6 Notice of Inspection Result Article 9 of Subcontracting Act 7 Notice of Contract Change Article 16 of Subcontracting Act 4.1.1 Issuance of Subcontract Document (Basic Contract, Written Confirmation of Subcontract)A. Occurrence of Written Issuance Obligation (Article 3 of Subcontracting Act)○ When the procurement team consigns manufacturing, repairing, construction or service(hereinafter referred to as ‘manufacturing, etc.’) of objects in the Subcontracting Act to ‘B’, the main contents of the contract such as content, quantity and unit price of entrusted objects shall be agreed and written subcontracted electronic contract shall be issued.○ In the event that the contents of the original contract are changed due to design change or consignment of additional construction, etc., a supplementary change document should be prepared and issued unless there is a special reason.B. Written Deion○ The subcontract shall reflect actual transaction, and the following shall be stated in principle.① Entrusted date, content, quantity, unit price, time and location of the delivery, method and timing of inspection of object, subcontract payment(advance payment of construction work, foundation fund, financing), and payment method and date② In the case where ‘A’ intends to provide ‘B’ raw materials required for manufacture of the object, etc., the name, quantity, date of supply, payment method and date③ Requirements, methods and procedures of subcontracting settlement due to changes in prices of raw materials, etc. after entrusting the manufacture of object item, etc.C. Timing for Written Document Issuance○ In principle, the purchasing team must issue a written contract without delay, the main contents of the contract are agreed.○ Even if it is difficult to issue a written contract without delay, unless there is a special reason, the purchasing team shall issue a written contract at least until the due date of each of the following.① Manufacturing Consignment : Before ‘B’ starts work for item delivery② Repair Consignment : Before ‘B’ starts repairing in accordance with the concluded contract③ Construction Consignment : Before ‘B’ starts contracted construction work④ Service Consignment : Before ‘B’ starts to perform service in accordance with the concluded contractD. Methods for Written Document Issuance○ ‘A’ shall issue to ‘B’ a contract sealed by the Company or the Representative Director(including an authorized digital signature pursuant to Article 2 (3) of the Electronic Signature Act) or signed contract.○ If a subcontracting party issues a written document without a signature or an original seal, it will be regarded as if it was not issued.○ You may issue a written notice in the form of electronic records as follows.- Sent through telecommunication line and recording in a file provided in electronic recording device used by ‘B’ (Example: E-Mail)- Providing reading of ‘B’ through telecommunication line and recording in a file provided in electronic recording device used by ‘B’ in that year (Example: Web)- Issuing electronic records to suppliers, such as floppy disks, CD-ROMs, etc.E. Exceptions○ If there is a certain matter that is difficult to confirm at the time of commissioning- If there is a justifiable reason for ‘A’ cannot confirm at the time of consignment, it may issue a document that does not mention the relevant matter.※ However, even in this case, the reason for not specifying the matters and the due date for setting the matters shall be specified, and when the matter is confirmed, a written statement shall be issued without delay.○ The case where there is frequent subcontracting transactions, and there is no big problem in establishing and maintaining contracts in light of characteristics of the industry or reality- If the basic contract is issued and order was made via fax, or other electronic form, and the contents of the order are objectively obvious- Some of the legal items are not listed in the contract but it can be found through quantity table or work order form, etc. provided at the time of ordering- The basic contract is sent and the Offer Sheets submitted to ‘A’ by ‘B’ while manufacturing the exported goods can be replaced with individual contracts- If the contract is replaced with a settlement agreement immediately after the completion of construction for a type of work that is clearly expected to fluctuate due to mild and frequent additional work related to the entrustment of additional construction※ However, in the following cases, it is regarded as non-issued written document.- The additional construction scope is divided and the amount is significant, but no specific contract or work order is issued- Additional or changed construction quantity has been proved during construction process but there is a dispute between the parties and the contract or settlement is not issuedF. Presumption of Subcontracts○ In the case where ‘A’ does not issue a subcontracting document while commissioning manufacturing, etc., ‘B’ can request confirmation by notifying ‘A’ of the work contents, subcontract payment, date and time of entrustment, company name and address and other entrusted contents in written document.-. In this case, ‘B’ uses “Request for Confirmation of Consignment Contents” as a standard form.※ Attachment 1. : Written Standard Form of Request for Confirmation of Consigned Contents○ The purchasing team shall return the written approval of consent or denial within 15 days after the notice of consigned contents confirmation request is received from ‘B’. In this case, the purchasing team responds in a standardized form to “reply to the request to confirm the consignment”.※ Attachment 2. : Written Standard Form of Response to Request for Confirmation of Consignment○ If ‘A’ fails to respond within 15 days, it shall be presumed that there has been a consignment in accordance with the notice given by ‘B’, except in cases where it is impossible for ‘A’ to respond due to natural disaster or other matters.○ The written reply to the consigned contents confirmation request and the consigned contents confirmation request shall be made to the address of ‘A’ and ‘B’, but the correspondences must be sent through certified mail or other means that can be verified for its content, (excluding e-mail).4.1.2 ReductionIssuing documents for decreasing contract amountA. Occurrence of Written Issuance Obligation (Article 11 of Subcontracting Act)○ When ‘A’ commissioned ‘B’ to manufacture, etc., if ‘A’ decides not to pay ‘B’ as specified in the original contract, and deducts it from the amount, the deduction document shall be issued to ‘B’.○ The reduction of subcontracting price shall be regarded as reduction of subcontracting price by applying the originally agreed price for the newly ordered quantity, in addition to the contracted quantity at the initial subcontracting price determined during the contract period.(including automatic extension of the contract period due to expiration of the contract period)○ When subcontracting contract is concluded, the transaction is frequent and general information related to transaction conditions, standard materials, manufacturing process, etc. such as settlement, transportation, inspection, return, etc. are included in the basic contract. The contents related to subcontracting such as unit price and quantity are delegated to the special agreement or order book, and it is regarded as “when commissioning” when it is notified to ‘B’.B. Written Deion○ In the case where ‘A’ wants to reduce the subcontracting payment, the reasons for reduction, standard, amount to be reduced, method of deduction, and other justification for the reduction should be stated.C. Timing for Written Documents Issuance○ In the event that ‘A’ intends to reduce the contract amount, it shall issue a written document in advance.D. Method for Written Documents Issuance○ If ‘A’ requires ‘B’ a written document regarding the reduction of subcontracting payment, the company or the representative director shall sign (including official digital signature under Article 2 (3) of the Electronic Signature Act) or issue a signed document.○ If ‘A’ wants to reduce it, it should use the standard form in Attachment 3.※ Attachment 3 : Written Standard Form for Subcontract Price Reduction○ Written issuance can be done via electronic records(e-mail, web, CD-ROM).E. Exceptions○ If there is a legitimate reason, a document that does not mention relevant matters for those that are difficult to be confirmed at the time of issuance of reduction can be issued by ‘A’.※ However, even in this case, the reason for not specifying matters and due date for setting such matters shall be specified, and if it is not confirmed, a written statement should be issued without delay.4.1.3 Issuance of Written Request for Technical DataA. Occurrence of Written Issuance Obligation (Article 12(3) of Subcontracting Act)○ If ‘A’ has a legitimate reason and requests ‘B’ to provide technical data, it shall issue a written request to ‘B’.○ Justifiable reasons for requesting to provide technical data- When it is required to evaluate the technical competence of its subcontractors, prepare reference prices for customized products, review proposals, develop common technologies, and meet RFP requirements of the client in the course of contracting through subcontracting, strategic purchasing, competitive bidding, etc.- When requesting technical data of ‘B’ for reasons such as joint patent application, patent application support, joint technology development, cost data request for adjustment of delivery unit price- If there was an escrow agreement for a technical data and condition to release the data to ‘A’ is met, ‘A’ can request for ‘B’’s technical data.B. Contents of Written Documents○ In the written request of technical data, the name and scope of technical data, purpose of request, confidentiality, right of ownership, cost of technical data, date of request, date of delivery, method of delivery and other matters that can prove that the request is legitimate should be included.※ Confidentiality Matters : If there is a timely and mutually signed confidentiality memorandum about which part of the technical data will be kept confidential, this should be attached.※ Rights of Ownership Relations : whether or not ‘A’ has entered into a mutual transfer agreement, whether the requested technology is a jointly developed technology, mutual agreement on the right-of-ownership relationship after technical data is provided, etc.C. Timing for Written Documents Issuance○ In the event that ‘A’ requests to provide technical data, the name and scope of technical data, purpose of request, date of request, delivery date, method of delivery, confidentiality, etc. shall be agreed with ‘A’ and written notice to ‘B’ shall be issued without any delay.D. Method for Written Documents Issuance○ ’A’ shall issue a contract signed (including an electronic digital signature pursuant to Article 2 (3) of the Electronic Signature Act) or signed seal by the company or its representative to ‘B’.○ In case that ‘A’ requires technical information of ‘B’ in written form, it should preferably use the technical data requirement standard document form of ‘Request for Technical Data/Guideline for Evaluation of Useful Behavior’.※ Attachment 4 : Written Standard Form of Technical Data Request○ Written issuance can be done via electronic records(e-mail, web, CD-ROM).E. Exceptions○ If there is a justifiable reason for ‘A’ and ‘B’ cannot confirm at the time of consignment, it may issue a document that does not mention the relevant matter.※ However, even in this case, the reason for not specifying the matters and the due date for setting the matters shall be specified, and if the matter is confirmed, a written statement shall be issued without delay.○ In cases where frequent technical data requests are inevitable in view of characteristics of industry or reality of transaction, after listing basic matters such as name and scope of technical data, purpose of request, confidentiality, rights of ownership, consideration, etc., you can use separate request form to specify additional requirements such as date of request, delivery date, and delivery method, etc.4.1.4 Issuance of Written Documents for OthersA. Receipt Certificate of subject item, etc. (Article 8 of Subcontracting Act)○ When ‘B’ delivers or provides subject item, etc., ‘B’ shall print out the transaction details for the subject item and receive confirmation of delivery from the Company, (Delivery result can be confirmed via computer as well) except when there is a reason for ‘A’ to turn to ‘B’’s responsibilities.○ ’A’ should issue a certificate of receipt to ‘B’ immediately, even before the inspection of targeted item (if the Internal Credit is opened pursuant to Article 7 of the Subcontract Act, immediately after completion of inspection).B. Issuance of Inspection Result for subject item, etc. (Article 9 of Subcontracting Act)○ Upon receipt of the targeted object, ‘A’ shall conduct necessary tests to confirm the completion of targeted object and scope of obligation to pay the payment, and submit the result to RQMIS(Rotem Quality Management Information System). ‘B’ shall check the result through RQMIS computer system or through off-line and shall be notified.○ In principle, ‘A’ can register the inspection result to RQMIS within 10 days from receipt of subject item from ‘B’ and can replace issuance of written document.○ However, ‘A’ may notify the result of inspection after more than 10 days if there is a justifiable reason as exemplified in the following.- If it is difficult to inspect within 10 days due to excessive amount of goods to be inspected- The period that is needed for inspection is long and only after a considerable period of time it is possible to make a decision on whether or not to pass- If there is a clear agreement between ‘A’ and ‘B’ about the extension of the inspection period○ If ‘A’ fails to notify ‘B’ of the inspection results through RQMIS within 10 days from the date of receipt without justifiable reasons, it shall be deemed to have passed the inspection.C. Issuance of Statement of Change in Contract Amount due to Design Change, etc.(Article 16 of Subcontracting Act)○ If the amount of the contract is increased or decreased due to changes in economic conditions such as design changes or price fluctuations after entrustment of manufacturing, etc., ‘A’ shall notify ‘B’ the reason and content of increase or decrease received from the ordering party.-. However, it shall be excluded if the ordering party has directly notified the cause and contents of the case to ‘B’.○ ’A’ shall issue a written notice to ‘B’ within 15 days from the date of receipt of contract amount increase or decrease from the ordering party.D. Method for Written Documents Issuance○ In the case of A, B, and C above, ‘A’ shall issue ‘B’ a written signature signed by the company or the representative director(including an official digital signature pursuant to Article 2 (3) of the Electronic Signature Act).○ In the case of A,B, and C above, written issuance can be done via electronic records(e-mail, web, CD-ROM). -
5.1 ‘A’ and ‘B’ shall retain the documents listed in Section 4 above and written form of each item of Paragraph 1 of Article 6 of the Enforcement Decree of Subcontract Act (Preservation of Documents). The documents to be preserved are shown in Table 2 below.
Serial Number Written Documents for those Subjected to Issuance Note 1 Basic Contract (Including additional/modified contract) Article 3 of Subcontracting Act 2 Written Confirmation of Subcontract (Attachment 1, 2) Article 3 (6) of Subcontracting Act 3 Written Reduction (Attachment 3) Article 11 of Subcontracting Act 4 Request for Technical Data (Attachment 4) Article 12 (3) of Subcontracting Act 5 Receipt Certificate for Subject Items, etc. Article 8 of Subcontracting Act 6 Notice of Inspection Result Article 9 of Subcontracting Act 7 Notice of Contract Change Article 16 of Subcontracting Act 8 Documents showing results and completion date of the inspection of object item, etc. Enforcement Decree Article 6 Clause 1 Second 9 Documents showing amount, means, date(including payment date, amount, and expiration date of check if paid in check) of subcontracting payment Enforcement Decree Article 6 Clause 1 Third 10 Documents that show date, amount of payment if advance, delay interest, discount of check and yearly interest, customs duties, etc. are paid Enforcement Decree Article 6 Clause 1 Fourth 11 When party ‘A’ provides raw materials necessary for the production of targeted items, etc. to party ‘B’ and deducts the consideration from the subcontract amount, documents describing contents of such materials and its deductible amount, date and reason Enforcement Decree Article 6 Clause 1 Fifth 12 If subcontract payment is adjusted for design changes, etc., documents describing such adjusted amount and reason Enforcement Decree Article 6 Clause 1 Sixth 13 If subcontract payment adjustment is requested by party ‘B’ due to changes in prices of raw materials, etc., documents describing the details of such application, contents of consultation, and the amount/reason for the adjustment Enforcement Decree Article 6 Clause 1 Seventh 14 Documents related to subcontracting decision such as bidding proposal, winning bidder decision document, quotation, specification manual, etc. Enforcement Decree Article 6 Clause 1 Eighth ○ The document to be preserved must be preserved in its original state at the time it was used for consultation, issuance, etc. The same applies for information processed in electronic form by devices with information processing capabilities.○ ’A’ and ‘B’ shall preserve documents for three years from the end of the subcontract transaction between the parties. Here, the term ‘subcontracting transaction’ means the following date.- Consignment of knowledge and information preparation out of manufacturing, repair, service consignment : the date of delivery of the object entrusted from ‘A’ to ‘B’- Labor supply contract during service consignment: upon completion of supply of service consigned from ‘A’ to ‘B’- Construction consignment : Upon completion of the consigned construction- If subcontracting contract is terminated or the transaction is suspended : Date of termination or suspension" -
6.1 Mandating Education to the Company that failed to issue or retain written documents○ If the Company violates Subcontracting Law that requires document issuance and retention, Fair Trade Commission may mandate educationfor Subcontracting Act compliance, in addition to ordering corrective actions, as included in this guideline, in accordance with the “Instruction for Mandatory Training of Subcontractors for Subcontracted Transaction Fairness”.6.2 Recommended Education for the Company that failed to issue or retain written documents.○ If the Company violates Subcontracting Law that requires document issuance and retention, Fair Trade Commission may recommend education for Subcontracting Act compliance, in addition to Notice of Warning, as included in this guideline.6.3 Recommending education for businesses that did not issue written(or did not preserve) documents repeatedly○ The Fair Trade Commission may recommend the completion of training to comply with the subcontracting law, including the contents of this guideline, for business operators who have been repeatedly accused for not issuing or not retaining documents as a result of a written survey conducted pursuant to Article 22-2 of the Subcontract Act.○ Under the Subcontracting Act, the same can be recommended for suspected non-retention of written documents.6.4 Conducting field surveys for businesses that did not issue written (or did not retain) documents repeatedly for a long time○ The Fair Trade Commission shall carry out on-site surveys for business operators who have been accused for not issuing written document for a long time, as a result of a written survey conducted pursuant to Article 2202 of the Subcontract Act.6.5 Method and Subjected companies of education recommended by Fair Trade Commission○ The education recommended by the Fair Trade Commission is targeted at employees who are in charge of subcontracting work of the company. Employees include the chief executive officer (CEO) of the company.○ The education recommended by the Fair Trade Commission shall be directed to the CEO and subcontractors of the company, respectively, as stipulated in 6.3 above.○ ’A’ may take following education for subcontracting instead- The Korean Fair Competition Federation, established pursuant to Article 32 of the 『Civil Act』- The Korean Fair Trade Commission under Article 48-2 of the『Monopoly Regulation and Fair Trade Act』- Korean Productivity Center in accordance with Article 32 of the『Industrial Development Act』- Construction contractors in accordance with Article 50 of the『Framework Act on the Construction Industry』- According to the Article 3, Paragraph 1, Item 4,『Small and Medium-sized Enterprises Cooperative Act』- Other organizations recognized by the Fair Trade Commission○ When Fair Trade Commission recommends an education, the company shall complete it within three months from the date of recommendation. The training time should be at least 3 hours.
-
1) This procedure is effective since July 9, 2014.